  1321   Wed 23 May 2012 11:47:15 Somkiat Wisaiphion Wed 23 May 2012 11:16:20 ProblemElectrical Note Beam DumpFixed25

 Beam Dump @ 92 mA to 0 mA

BM-PS current drop about 550A 1.55

Electrical trip reclosed from PEA

Y-BM-M, Y-QD-M, Y-QD-M fault to reset

RF RC-CURR fault to reset

RF TUNER FAULT to reset

 

  2607   Sun 30 Sep 2012 11:01:59 Ekwarong Amornwittawat Sun 30 Sep 2012 01:28:16 ProblemMagnet Note Beam dump @ 73 mA, no fault. May be problem is from S-STH-14 power supply.Not Fixed26

Edit by Supan

  5582   Tue 29 Oct 2013 08:56:00 Sarawut Chitthaisong Tue 29 Oct 2013 08:02:26 ProblemMagnet Warning S-STH-M11, STH Magnet PS1 FaultFixed26

 Reset by K.Supachai

  10038   Mon 07 Sep 2015 03:09:28 Somkiat Wisaiphion Mon 07 Sep 2015 02:29:05 ProblemOther Note Beam drop from 86 mA to 30 mA 29
  10801   Sat 07 Nov 2015 10:47:34 Somkiat Wisaiphion Sat 07 Nov 2015 10:11:15 RoutineOperation Note Dump Beam @ 45.1 mA 31
  9908   Wed 26 Aug 2015 11:59:21 Sarawut Chitthaisong Wed 26 Aug 2015 11:23:15 ProblemVacuum Warning Beam dump @112 mA "High vacuum pressure in STR"Completed33

Gate valve is close (Vacuum interlock is working)

  295   Sun 18 Mar 2012 15:33:02 Ekwarong Amornwittawat Sun 18 Mar 2012 14:44:17 ProblemElectrical Note Beam DumpFixed43

 Beam Dump @71ma

S-BM-M, Y-BM-M, Y-QF-M, Y-QD-M, LINAC FC CUR  --- FAULT --- RESET

Attachment 1: Beam_Dump_2012-03-18_14-44_@71mA.PNG
Beam_Dump_2012-03-18_14-44_@71mA.PNG
  131   Thu 08 Mar 2012 15:59:10 Supachai Prawanta Thu 08 Mar 2012 11:20:00 ProblemUtility Note the cooling fan of the fifth cooling tower has damageFixed50

The cooling fan of the fifth cooling tower has damage

      At 11:20 am, the cooling fan of the fifth cooling tower has damage

     At 11:50 am, we had changed the fifth cooling tower to the third cooling tower

 

Attachment 1: DIW_magnet_8_March_2012.png
DIW_magnet_8_March_2012.png
  760   Thu 26 Apr 2012 14:52:18 Somkiat Wisaiphion Thu 26 Apr 2012 13:47:00 ProblemElectrical Note Beam DumpFixed60

 Beam Dump @ 80 mA to 0 mA

PWS-Pump (SYN) fault

SYN-BM, QM fault

Linac fault

S-BM fault

  364   Thu 22 Mar 2012 13:25:21 Somkiat Wisaiphion Thu 22 Mar 2012 12:03:00 ProblemOperation Note Beam Dump 74

 Beam dump 85 mA to 0 mA

Cause of beam dump (12:03)

- Vacuum pressure of STR-section 4 high 7.0x10-8 torr

- BL-7 front-end vacuum pressure high 5x10-8 torr

- Ion pump power supply S-SIP7, S-SIP8 trip

- Ion pump power supply BL-7 front-end trip

- STR gate value close

Real cause of this situation is back pressure accident from BL-8 (P=1.0E-5 at BL-8 frontend) ; editted by Supan Boonsuya

Attachment 1: Beam_Current_VS_STR_Vaccum.JPG
Beam_Current_VS_STR_Vaccum.JPG
  11548   Sat 16 Jan 2016 20:13:58 Sarawut Chitthaisong Sat 16 Jan 2016 15:30:42 ProblemControl Warning Beam dump @88.06 mA "CNT-DCS error"Completed74

the systems were shutdown > reset PLC of CNT-DCS

  5579   Mon 28 Oct 2013 22:36:10 Somkiat Wisaiphion Mon 28 Oct 2013 22:30:00 RoutineBeam Dynamics Note SPS Orbit Control system Complete @151 mA 90
  141   Fri 09 Mar 2012 00:51:07 Ekwarong Amornwittawat Mon 05 Mar 2012 07:30:08 ProblemUtility Note Water LeakFixed94

 Water Leak @ BL3

  948   Mon 07 May 2012 21:25:05 Somkiat Wisaiphion Mon 07 May 2012 18:14:00 ProblemElectrical Note Electricity failureFixed96

 PWS-Pump fault (Pump stop)

Chiller (CH-1) surge - CDP-1 dry running

SYN-BM, QM fault

S-BM fault

H-BV2 fault

Linac fault

SYN-RF fault

 

  424   Sun 25 Mar 2012 14:38:28 Somkiat Wisaiphion Sun 25 Mar 2012 12:56:00 ProblemElectrical Note Beam dump 80 mAFixed97

- Beam dump 80 mA

 - Main Electricity Shutdown 10 sec.

- Main DI water cooling system triped to reset

- Magnets and RF all shutdown to reset

 

  955   Mon 07 May 2012 21:31:28 Somkiat Wisaiphion Mon 07 May 2012 20:48:00 ProblemElectrical Note Electricity System failureFixed110

PWS-Pump fault (Pump stop)

Chiller (CH-1) surge - CDP-1 dry running

SYN-BM, QM fault

H-BV2 fault

Linac fault

SYN-RF fault

  132   Thu 08 Mar 2012 16:46:38 Nawin Juntong Thu 08 Mar 2012 14:00:00 OtherRF Warning Setup X-ray measuring equipment for SYN Cavity voltage measurementCompleted150

 Setup X-ray measuring equipment for SYN Cavity voltage measurement.

This equipment is located near RF cavity in SYN room.

Please be aware of this tool. It contains radiation and toxic materials. 

  154   Fri 09 Mar 2012 16:41:23 Nawin Juntong Fri 09 Mar 2012 14:00:00 Machine StudyRF Idea Measure SYN RF Cavity VoltageCompleted150

 Measure SYN RF Cavity Voltage using X-ray end point energy technique

  1539   Wed 08 Aug 2012 01:19:27 Somkiat Wisaiphion Wed 06 Jun 2012 16:40:00 ConfigurationLINAC Note Change electron gun finishCompleted170
  2243   Tue 11 Sep 2012 09:30:01 Somkiat Wisaiphion Thu 06 Sep 2012 11:00:00 ProblemMagnet Note Test SYN by adjust QF, BM patternCompleted313

 Try to increase SYN current

Try to solve SYN current limitation problem

  63   Sun 04 Mar 2012 18:12:00 Somkiat Wisaiphion Sun 04 Mar 2012 15:38:00 ProblemElectrical Note Electrical 698

- Electricity sag-swell (failure)

- PWP failure

- All water cooled magnet fault

- Beam dump @ 57 mA

- Linac fault
 

  395   Fri 23 Mar 2012 16:21:54 Supachai Prawanta Wed 21 Mar 2012 17:00:00 ProblemUtility Note The inlet temperature of cooling water for the storage ring was increasedCompleted1620

 Problems

1.      The temperature of cooling water for the storage ring was increased on Wednesday 21 March 2012 at 5.00 pm – Thursday 22 March 2012.

2.      The inlet temperature for the storage ring was increased from 30.5C to 33.2C.

3.      The flow rate of softener water for the cooling tower was decreased, because the disc filter of the softener was clogged.

Solutions

1.      Cleaned the disc filter of the softener on Thursday 22 March 2012 at 9.00 am.

2.      Cleaned the strainer of cooling tower water pump CTW-P1 on Thursday 22 March 2012 at 8.00 pm.

3.      Setting the inlet temperature for the storage ring at 31.0C (old setting 30.5C)

Status

1.       Working finished on Thursday 22 March 2012 at 9.00 pm.

Attachment 1: problem_of_cooling_water_system.png
problem_of_cooling_water_system.png
  457   Tue 27 Mar 2012 11:25:31 Supachai Prawanta Tue 27 Mar 2012 11:00:00 RepairUtility Note Finish for repaired the cooling fan of the cooling tower CT5 Fixed14400

Problem:

 1. Bearing of the pulley of the cooling fan CT5 were broken.

Solution:

1. Welding and milling for the pulley shaft.

2. Installed three new bearing for pulley.

Status:

1. Fixed 

 