SLRI Machine Status Accelerator Operation Cryogenics
  Operation E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 83     Entry time: Mon 05 Mar 2012 11:18:53
Author: Natthawut Suradet 
Event Time:Mon 05 Mar 2012 11:15:55 
Type: Routine 
Section: Operation 
Icon: Note 
Subject: Ramping complete 
Status:  
RTime (min):  

 Store beam @ 138 mA

STR-RF-FW Power = 15.4 kW

STR-RF-Ref Power = 216 W

Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1