SLRI Machine Status Accelerator Operation Cryogenics
  Operation E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 62     Entry time: Sun 04 Mar 2012 08:34:21
Author: Sudjakom Jummunt 
Event Time:Sun 04 Mar 2012 08:20:00 
Type: Routine 
Section: Operation 
Icon: Note 
Subject: SPS Close Orbit correction 
Status:  
RTime (min):  

  SPS close orbit correction

Before    dRMSx 0.0697   mm.

             dRMSy 0.1614   mm.

 

After      dRMSx 0.0254   mm.     0.0178 mm.

             dRMSy 0.0240   mm.     0.0208 mm.

Complete @ 127.6  mA

Attachment 1: 2012-03-04_8-24.PNG  79 kB  | Hide | Hide all
2012-03-04_8-24.PNG
Attachment 2: 2012-03-04_8-26.PNG  75 kB  | Hide | Hide all
2012-03-04_8-26.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1