Message ID: 12895     Entry time: Thu 19 Oct 2017 19:40:42
Author: Nitisart Kumdee 
Event Time:Thu 19 Oct 2017 18:32:00 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

18:21 Beam dump by itseft / Found RF fault => Vaccuum interlock occur

18:32 Dump beam

18:33 Warm up HBT and STR magnets

18:39 Reset local vaccuum interlock controller => OK

19:00 Start injection

19:03 Stop injection @ 152.67 mA

19:11 Ramp up energy to 1.2 Gev. complete @ 150.22 mA

19:21 Close MPW Gap to 23.50 mm complete

19.26 SOFB complete @ 146.55 mA