SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook, Page 76 of 80  Not logged in Accelerator E-Logbook
ID Date Author Event Time Type Section Icon Subject Status RTime (min) Text Attachments
  745   Wed 25 Apr 2012 08:43:02 Natthawut Suradet Wed 25 Apr 2012 01:39:54 ProblemControl Note Fix control room's live cameraFixed Fixed at configuration panel and changed
url path on accelerator's website.
  
  740   Wed 25 Apr 2012 08:20:45 Tewarit Praneetponkrung Wed 25 Apr 2012 08:06:14 ProblemElectrical Note Y-BM-M, Y-QF-M faultFixed     
  701   Sun 22 Apr 2012 08:29:16 Somkiat Wisaiphion Sun 22 Apr 2012 08:10:00 ProblemRF Note SYN-RF IPA FaultFixed  SYN-RF IPA Fault 8 times   
  699   Sun 22 Apr 2012 08:28:27 Somkiat Wisaiphion Sun 22 Apr 2012 08:06:00 ProblemElectrical Note Y-BM-M, Y-QF-M, Y-QD-M faultFixed     
  679   Fri 20 Apr 2012 20:33:31 Tewarit Praneetponkrung Fri 20 Apr 2012 20:00:11 OtherOther Note BL8 user Request 10 minutes      
  678   Fri 20 Apr 2012 20:27:53 Tewarit Praneetponkrung Fri 20 Apr 2012 16:40:12 ProblemUtility Note DIW-STR INLET alarm   DIW-STR INLET Temp. 32.3 C
 
  
  677   Fri 20 Apr 2012 20:27:04 Tewarit Praneetponkrung Fri 20 Apr 2012 16:39:35 RepairRF Note Test Run SYN   Test run booster synchrotron after
repair IPA of Y-RF
  
  676   Fri 20 Apr 2012 20:26:31 Tewarit Praneetponkrung Fri 20 Apr 2012 14:26:16 RepairRF Note Still have fault at IPA      
  675   Fri 20 Apr 2012 20:26:12 Tewarit Praneetponkrung Fri 20 Apr 2012 14:23:24 RepairRF Note Test Run SYN   Test run Y-RF after Power detect
board of IPA was repaired.
  
  671   Fri 20 Apr 2012 08:31:47 Somkiat Wisaiphion Fri 20 Apr 2012 08:08:00 ProblemRF Note SYN-RF IPA FaultFixed  SYN-RF IPA Fault 5 times    
  664   Thu 19 Apr 2012 20:56:48 Tewarit Praneetponkrung Thu 19 Apr 2012 20:35:27 ProblemRF Note Can not Injection @ 90 mAFixed  RF Input Power 0 kW
>>>Check RF system Normal
and Reset IPA >>>OK
  
  663   Thu 19 Apr 2012 20:56:24 Tewarit Praneetponkrung Thu 19 Apr 2012 20:22:35 ProblemRF Note Can not Injection @ 30 mAFixed   RF Input Power 0 kW
>>>Check RF system Normal
and Reset IPA >>>OK
  
  659   Thu 19 Apr 2012 20:49:39 Tewarit Praneetponkrung Thu 19 Apr 2012 20:00:44 OtherOther Note BL2 user Request 10 minutes      
  658   Thu 19 Apr 2012 20:46:21 Tewarit Praneetponkrung Thu 19 Apr 2012 19:30:58 ProblemRF Note RF - Tuner (SYN) faultFixed     
  657   Thu 19 Apr 2012 16:08:41 Ekwarong Amornwittawat Thu 19 Apr 2012 10:04:47 MaintenanceRF Note Repair IPA of Y-RFFixed  run LINAC & all synchrotron.
run Booster Synchrotron (Disconnected
Ref Coupler input).
  
  656   Thu 19 Apr 2012 16:02:39 Natthawut Suradet Thu 19 Apr 2012 15:59:19 InstallationControl Note Move "FTP Via Network drive" and "STR-DCCT V2" to another server  Move
"FTP Via Network drive"
from CNT-SRV to OPR-PC1
  
  651   Thu 19 Apr 2012 08:53:25 Somkiat Wisaiphion Thu 19 Apr 2012 08:07:00 ProblemRF Note SYN-RF IPA FaultFixed  Disconnected the inter lock socket
of the SYN RF-IPA
  
  646   Wed 18 Apr 2012 18:41:47 Tewarit Praneetponkrung Wed 18 Apr 2012 18:34:09 ConfigurationUtility Note Setting DIW-STR from 31.0 C to 31.5 C Fixed     
  639   Wed 18 Apr 2012 18:04:13 Natthawut Suradet Wed 18 Apr 2012 18:03:29 ConfigurationControl Note Change DIW-STR high alarm setpoint Completed  Change DIW-STR high temperature
alarm setpoint
  
  628   Wed 18 Apr 2012 13:30:50 Natthawut Suradet Mon 16 Apr 2012 06:27:55 ProblemControl Reply Re: CNT-SRV crash every few daysUnder Process Scan and remove KIDO worm from control
room computers.
There are 2 computers infects.
  
  622   Wed 18 Apr 2012 13:24:25 Ekwarong Amornwittawat Wed 18 Apr 2012 09:25:46 MaintenanceRF Note Test 2 HPA modulesCompleted  Test 2 HPA modules from Cryoelectra
Complete at 12:29
- Completed test 2 HPA modules
  
  615   Wed 18 Apr 2012 08:17:08 Somkiat Wisaiphion Wed 18 Apr 2012 07:58:00 ProblemRF Note RF - Tuner (SYN) fault Fixed     
  610   Tue 17 Apr 2012 23:54:09 Tewarit Praneetponkrung Tue 17 Apr 2012 22:56:21 ProblemElectrical Note Y-BM-M, Y-QF-M, Y-QD-M faultFixed     
  601   Tue 17 Apr 2012 23:44:21 Tewarit Praneetponkrung Tue 17 Apr 2012 09:20:00 MaintenanceMagnet Note Switch ON    SYN magnet, SYN RF   
  600   Tue 17 Apr 2012 23:42:49 Tewarit Praneetponkrung Tue 17 Apr 2012 09:00:00 MaintenanceOther Note Preventive maintenance      
  599   Mon 16 Apr 2012 06:29:37 Natthawut Suradet Mon 16 Apr 2012 06:27:55 ProblemControl Warning CNT-SRV crash every few daysNot Fixed     
  588   Fri 06 Apr 2012 08:20:12 Ekwarong Amornwittawat Fri 06 Apr 2012 08:09:53 ProblemMagnet Note Y-BM-M, Y-QF-M, Y-QD-M fault      
  580   Thu 05 Apr 2012 20:32:17 Somkiat Wisaiphion Thu 05 Apr 2012 20:03:00 ProblemMagnet Note S-STH-M16 fault Fixed     
  565   Wed 04 Apr 2012 08:59:17 Natthawut Suradet Wed 04 Apr 2012 08:55:32 ConfigurationControl Note Change step and delay time of ramping function (stage 1)Completed Change timing of ramping (stage 1 only)
 
OId
  
  552   Tue 03 Apr 2012 16:58:07 Somkiat Wisaiphion Tue 03 Apr 2012 15:20:00 ConfigurationRF Note Unpluged the CNI of FB board Fixed  Unpluged the CNI of FB board  of
the IPA to solve IPA fault
  
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1