  Accelerator E-Logbook, Page 3 of 80  Not logged in Accelerator E-Logbook
ID Date Author Event Time Type Section Icon Subject Status RTime (min) Text Attachments
  6415   Thu 25 Apr 2019 08:01:42 Nitisart Kumdee Thu 25 Apr 2019 08:00:12 Beam OperationMachine Operation Note Beam Injection Completed 07:35 Test run syn >> OK (Isyn
= 18 mA)

08:00 Stop SOFB @ 57.70 mA
 SOFB_2019-04-25-0759.PNG 
  6414   Wed 24 Apr 2019 17:42:16 Chanwawit Somprasong Wed 24 Apr 2019 16:02:59 Beam OperationMachine Operation Warning Beam dumpCompleted10016:02 Beam dump @ 85 mA due to electrical
unstable   S-BM , Y-GF , Y-QD ,
H-BV-M1 , H-BH-M1 fault
  
  6413   Wed 24 Apr 2019 08:08:50 Nitisart Kumdee Wed 24 Apr 2019 08:00:19 Beam OperationMachine Operation Note Beam Injection Completed 07:41 Test run syn >> OK  (Isyn
= 12 mA)

08:00 Stop SOFB @ 68.44 mA
 SOFB_2019-04-24-0758.PNG 
  6412   Tue 23 Apr 2019 20:26:32 Chanwawit Somprasong Tue 23 Apr 2019 20:05:54 Beam OperationMachine Operation Note Beam Injection Completed 19:43 test run SYN >>> OK ( Isyn=
20 mA)

19:48 BL-4 request time 5 min
 SOFB_2019-04-23-2003.PNG 
  6411   Tue 23 Apr 2019 12:29:07 Somkiat Wisaiphion Tue 23 Apr 2019 12:01:37 Beam OperationMachine Operation Note Beam Injection   12.01 Stop SOFB @ 72 mA

12.02 Warm up HBT, Set parameter
for injection and open MPW gap
  
  6410   Tue 23 Apr 2019 12:27:28 Somkiat Wisaiphion Tue 23 Apr 2019 12:25:56 Beam OperationMachine Operation Warning Y-SMI-PS faultFixed47Changed IC7915,
Capacitor 0.1 uF and 1000 uF/50V on board
for setting voltage
  
  6409   Tue 23 Apr 2019 08:15:23 Nitisart Kumdee Tue 23 Apr 2019 08:10:53 Beam OperationMachine Operation Note Beam Injection Completed 07:38 Test run SYN => OK (Isyn = 16
mA)

07:47 BL5.2 request time
 SOFB_2019-04-23-0810.PNG 
  6408   Tue 23 Apr 2019 00:20:31 Chanwawit Somprasong Tue 23 Apr 2019 00:45:08 Beam OperationMachine Operation Warning Beam dumpCompleted3323:45 Beam dump @ 115 mA due to RF-STR
fault

23:56 Warm up HBT , set parameter
  
  6407   Mon 22 Apr 2019 20:46:20 Chanwawit Somprasong Mon 22 Apr 2019 20:10:58 Beam OperationMachine Operation Note Beam Injection Completed 19:11 BL-1.2 request 10 min.

19:16 BL-5.2 request 10 min.

19:29 test run syn >>>
 SOFB_2019-04-22-2005.PNG 
  6406   Mon 22 Apr 2019 08:45:17 Nitisart Kumdee Mon 22 Apr 2019 08:10:47 Beam OperationMachine Operation Note Beam Injection Completed 07:30 Test
run syn >> SYN-RF progarm error =>
restart SYN-RF computer => OK
 SOFB_2019-04-22-0811.PNG 
  6405   Sun 21 Apr 2019 20:27:13 Somkiat Wisaiphion Sun 21 Apr 2019 20:09:48 Beam OperationMachine Operation Note Beam Injection   19:55 BL6.2b request 5 min.

20:09 Stop SOFB @ 108.7 mA

20:10 Warm up HBT, set parameter
  
  6404   Sun 21 Apr 2019 16:29:01 Nitisart Kumdee Sun 21 Apr 2019 14:14:59 ProblemOther Warning Beam drop from 93 mA to 83 mACompleted3414.14 Beam
drop from 93.83 mA to 83.26 mA.
         
 SOFB_2019-04-21-1601.PNGBeam_drop_(21_Apr_2019).PNG 
  6403   Sun 21 Apr 2019 08:14:26 Apiwat Pinyoyang Sun 21 Apr 2019 08:10:16 Beam OperationMachine Operation Note Beam Injection Completed 07:30 Test run syn >> OK  (Isyn
= 10 mA)

07:55
 SOFB_2019-04-21-0810.PNG 
  6402   Sat 20 Apr 2019 20:26:38 Somkiat Wisaiphion Sat 20 Apr 2019 20:00:18 Beam OperationMachine Operation Note Beam Injection   19:40 Test run SYN >> OK (Isyn=
10 mA)

20:00 Stop SOFB @ 66 mA
  
  6401   Sat 20 Apr 2019 08:24:45 Nitisart Kumdee Sat 20 Apr 2019 08:00:34 Beam OperationMachine Operation Note Beam Injection Completed 07:32 Test run syn >> OK
 (Isyn = 12 mA)

08:00 Stop SOFB @ 63.38 mA
  
  6400   Fri 19 Apr 2019 08:57:35 Apiwat Pinyoyang Fri 19 Apr 2019 08:00:18 Beam OperationMachine Operation Note Beam Injection Completed 07:40 Test run syn >> OK
 (Isyn = 10 mA)

08:00 Stop SOFB @ 59.2 mA
 SOFB_2019-04-19-0800.PNG 
  6399   Wed 17 Apr 2019 14:59:05 Thapakron Pulampong Wed 17 Apr 2019 14:58:51 Measured ParameterBeam Dynamics Note Beam parameter after April Shutdown  -Hardware

Name   Ref   
Now    Diff
 Orbit20.PNGSOFB.PNG 
  6398   Wed 10 Apr 2019 09:40:41 Thapakron Pulampong Thu 11 Apr 2019 11:00:01 Machine StudyBeam Dynamics Note SMPW only commissioning  10/04/2019

SMPW only mode commissioning

09:38 Temp check no beam (B:\TP\LabviewPro\TempMonSMPW.vi)
 tempNoBeam.PNGtempNoBeam2.PNGQ_prior.PNG 
  6397   Sun 07 Apr 2019 20:48:37 Somkiat Wisaiphion Sun 07 Apr 2019 20:10:55 Beam OperationMachine Operation Note Beam Injection   19:40 Test run SYN >> OK (Isyn=
10 mA)

19:30 BL6b request 10 min.
 SOFB_2019-04-07-2010.PNG 
  6396   Sun 07 Apr 2019 08:48:13 Somkiat Wisaiphion Sun 07 Apr 2019 08:00:30 Beam OperationMachine Operation Note Beam Injection   07:30 Test run syn >> OK
 (Isyn = 5 mA)

08:00 Stop SOFB @ 66.5 mA
  
  6395   Sat 06 Apr 2019 19:58:56 Apiwat Pinyoyang Sat 06 Apr 2019 20:00:46 Beam OperationMachine Operation Note Beam Injection Completed 19:40 Test run SYN >> OK (Isyn=
10 mA)

20:00 Stop SOFB @ 66.8 mA
 SOFB_2019-04-06-2000.PNG 
  6394   Sat 06 Apr 2019 08:34:20 Somkiat Wisaiphion Sat 06 Apr 2019 08:00:36 Beam OperationMachine Operation Note Beam Injection   07:35 Test run syn >> OK
 (Isyn = 10 mA)

08:00 Stop SOFB @ 71.5 mA
  
  6393   Fri 05 Apr 2019 20:56:17 Apiwat Pinyoyang Fri 05 Apr 2019 20:10:33 Beam OperationMachine Operation Note Beam Injection Completed 19:30 Test run SYN >> OK (Isyn=
10 mA)

19.53 BL-8 request time 10 min
 SOFB_2019-04-05-2010.PNG 
  6392   Fri 05 Apr 2019 08:29:19 Somkiat Wisaiphion Fri 05 Apr 2019 08:00:37 Beam OperationMachine Operation Note Beam Injection   07:35 Test run syn >> OK
 (Isyn = 10 mA)

08:00 Stop SOFB @ 69 mA
  
  6391   Thu 04 Apr 2019 20:15:51 Apiwat Pinyoyang Thu 04 Apr 2019 20:05:25 Beam OperationMachine Operation Idea Beam Injection Completed3819:40 Test run SYN >> OK (Isyn=
10 mA)

20:05
  
  6390   Thu 04 Apr 2019 08:18:11 Somkiat Wisaiphion Thu 04 Apr 2019 08:00:28 Beam OperationMachine Operation Note Beam Injection   07:30 Test run syn >> OK
 (Isyn = 10 mA)

08:00 Stop SOFB @ 62.8 mA
  
  6389   Wed 03 Apr 2019 19:11:36 Apiwat Pinyoyang Wed 03 Apr 2019 17:57:45 ProblemElectrical Warning Beam dumpCompleted6717:57 Beam
dump @ 70 mA / Electrical unstable

 
  
  6388   Wed 03 Apr 2019 08:01:09 Apiwat Pinyoyang Wed 03 Apr 2019 08:00:02 Beam OperationMachine Operation Note Beam Injection Completed 07:40 Test run syn >> OK
 (Isyn = 15 mA)

08:00 Stop SOFB @ 64 mA
 SOFB_2019-04-03-0800.PNG 
  6387   Tue 02 Apr 2019 20:06:43 Apiwat Pinyoyang Tue 02 Apr 2019 20:00:03 Beam OperationMachine Operation Note Beam Injection Completed 19:40 Test run SYN >> OK (Isyn=
15 mA)

20:00 Stop SOFB @ 66 mA
 SOFB_2019-04-02-2000.PNG 
  6386   Tue 02 Apr 2019 13:49:58 Thapakron Pulampong Tue 02 Apr 2019 13:49:41 Measured ParameterBeam Dynamics Note Beam parameter before April ShutdownCompleted +Data
collection prior SMPW commissioing and April
shutdown
 SOFB_program.PNGSOFB_refXY.PNGCompare.png 