SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook, Page 1 of 80  Not logged in Accelerator E-Logbook
New entries since:Thu Jan 1 07:00:00 1970
ID Date Author Event Time Type Section Icon Subject Status RTime (min) Text Attachments
  6473   Tue 21 May 2019 20:25:54 Chanwawit Somprasong Tue 21 May 2019 20:10:04 Beam OperationMachine Operation Note Beam Injection Completed 17:30 Y-QD-M fault reset >>>ok

19:21 Test run SYN >>>
ok  ( Isyn=14 mA)
 SOFB_2019-05-21-2003.PNG 
  6472   Tue 21 May 2019 15:29:40 Somkiat Wisaiphion Tue 21 May 2019 14:35:47 ProblemOther Warning  Dump beam 117 mA due to SMPW PS water flow faultFixed5814:35 Dump
beam 117 mA due to SMPW PS water flow fault
15:01 Warm up HBT magnets and set
  
  6471   Tue 21 May 2019 11:08:40 Somkiat Wisaiphion Tue 21 May 2019 07:26:47 ProblemElectrical Warning Beam dump / Electrical PEA Over VoltageFixed14207:26 Electrical
failure (Over Voltage from PEA)
         
  
  6470   Mon 20 May 2019 23:25:38 Nitisart Kumdee Mon 20 May 2019 22:01:12 ProblemOther Warning Beam drop from 132.01 mA to 75.85 mA.Completed4422:01 Beam
drop from 132.01 mA to 75.85 mA.

22:10 Stop SOFB @ 75.43 mA
  
  6469   Mon 20 May 2019 23:01:22 Nitisart Kumdee Mon 20 May 2019 21:47:52 ProblemControl Warning SOFB uncontrollableFixed 21:47 SOFB
uncontrollable (STV and STH cannot read monitor
current),
  
  6468   Mon 20 May 2019 20:07:33 Nitisart Kumdee Mon 20 May 2019 20:05:49 Beam OperationMachine Operation Note Beam Injection Completed 19:43 Test run SYN >> OK (ISYN=
14 mA).

19:53 BL1.1 request time
 SOFB_2019-05-20-2003.PNG 
  6467   Mon 20 May 2019 09:36:21 Chanwawit Somprasong Mon 20 May 2019 08:00:22 Beam OperationMachine Operation Warning SMPW faultCompleted507:17 test run SYN = ok ( Isyn= 12 mA)

7:22 SMPW fault ; SOFB uncontrollable

8:05 warm up HBT , set parameter
 SOFB_2019-05-20-0805.PNG 
  6466   Sun 19 May 2019 20:27:55 Nitisart Kumdee Sun 19 May 2019 20:10:11 Beam OperationMachine Operation Note Beam Injection Completed 19:29 Test run SYN >> OK (ISYN=
14 mA).

19:45 BL8 request time 10 min.
 SOFB_2019-05-19-2008.PNG 
  6465   Sun 19 May 2019 08:08:06 Apiwat Pinyoyang Sun 19 May 2019 08:00:51 Beam OperationMachine Operation Note Beam Injection Completed 07:30 Test run syn >> OK (Isyn
= 10 mA)

08:00 Stop SOFB @ 73.8 mA
 SOFB_2019-05-19-0756.PNG 
  6464   Sat 18 May 2019 22:24:17 Nitisart Kumdee Sat 18 May 2019 19:47:54 ProblemUtility Warning Chiller 1.1 OFF - "Slave URGENT STOP"  19:47 Chiller 1.1 OFF - "Slave
URGENT STOP"
 S__34267145.jpgS__34267146.jpg 
  6463   Sat 18 May 2019 20:09:38 Nitisart Kumdee Sat 18 May 2019 20:00:42 Beam OperationMachine Operation Note Beam Injection Completed 19:29 Test run SYN >> OK (ISYN=
12mA).

20:00 Stop SOFB @ 74.31 mA.
 SOFB_2019-05-18-1958.PNG 
  6462   Sat 18 May 2019 08:22:36 Apiwat Pinyoyang Sat 18 May 2019 08:10:44 Beam OperationMachine Operation Note Beam Injection Completed 07:15 BL2.2 request 10 min.

07:40 Test run syn >>
OK (Isyn = 10 mA)
 2019-05-18-0805.PNG 
  6461   Fri 17 May 2019 20:37:50 Somkiat Wisaiphion Fri 17 May 2019 20:10:01 Beam OperationMachine Operation Note Beam Injection   20:10 stop SOFB @ 72.3 mA

20:11 warm up HBT , set parameter
for injection , open MPW gap 
 2019-05-17-2010.PNG 
  6460   Fri 17 May 2019 08:35:09 Apiwat Pinyoyang Fri 17 May 2019 08:00:27 Beam OperationMachine Operation Note Beam Injection Completed 07:15 BL2.2 request 10 min.

07:40 Test run syn >>
OK (Isyn = 10 mA)
  
  6459   Thu 16 May 2019 21:42:44 Somkiat Wisaiphion Thu 16 May 2019 20:00:53 Beam OperationMachine Operation Note Beam Injection Fixed5319:45 BL8 request 10 min.

20:10 stop SOFB @ 98.9 mA

20:11 warm up HBT , set parameter
 2019-05-16-2010.PNG 
  6458   Thu 16 May 2019 14:04:23 Apiwat Pinyoyang Thu 16 May 2019 12:16:26 ProblemElectrical Warning Beam dumpCompleted9412:16 Beam
dump @ 145.44 mA / H-BH-M1, H-BH-M2, Y-QD-M,
Y-QF-M, STR-RF fault / Reset >>>
  
  6457   Thu 16 May 2019 13:53:36 Apiwat Pinyoyang Thu 16 May 2019 08:00:46 Beam OperationMachine Operation Warning Beam Injection Completed21508:00 Stop SOFB @ 148.3 mA

08:01 Warm up HBT magnet, Set parameter
for injection, Open MPW gap
  
  6456   Wed 15 May 2019 20:29:09 Somkiat Wisaiphion Wed 15 May 2019 20:02:29 Beam OperationMachine Operation Note Beam Injection    

20:02 stop SOFB @ 75.1 mA

20:05 warm up HBT , set parameter
 2019-05-15-2000.PNG 
  6455   Wed 15 May 2019 20:28:23 Somkiat Wisaiphion Wed 15 May 2019 19:40:34 ProblemControl Warning Y-QD-M Fault  Reboot PS --> OK.   
  6454   Wed 15 May 2019 08:32:40 Somkiat Wisaiphion Wed 15 May 2019 08:10:01 Beam OperationMachine Operation Note Beam Injection   07:40 Test run syn >> OK (Isyn
= 12 mA)

07:45 BL1.1 request 10 min.
 2019-05-15-0810.PNG 
  6453   Tue 14 May 2019 21:24:18 Somkiat Wisaiphion Tue 14 May 2019 20:00:36 Beam OperationMachine Operation Warning Beam Injection Fixed4819:40 test run SYN = OK (Isyn=10 mA)

20:00 stop SOFB @ 73.7 mA

20:01 warm up HBT , set parameter
 2019-05-14-2000.PNG 
  6452   Tue 14 May 2019 08:18:38 Somkiat Wisaiphion Tue 14 May 2019 08:00:00 Beam OperationMachine Operation Note Beam Injection   07:36 Test run syn >> OK (Isyn
= 10 mA)

08:00 Stop SOFB @ 74.9 mA
 2019-05-14-0800.PNG 
  6451   Mon 13 May 2019 20:28:23 Somkiat Wisaiphion Mon 13 May 2019 20:10:44 Beam OperationMachine Operation Note Beam Injection   19:35 test run SYN = OK (Isyn=10 mA)

19:45 BL-8 request time 10 min 

20:10 stop SOFB @ 74.3 mA
 2019-05-13-2010.PNG 
  6450   Mon 13 May 2019 09:14:43 Apiwat Pinyoyang Sun 12 May 2019 14:40:51 ProblemCryogenics Warning SMPW faultCompleted34314:40 SOFB
uncontrolable / SMPW fault / Reset >>>
OK
  
  6449   Mon 13 May 2019 08:43:19 Somkiat Wisaiphion Mon 13 May 2019 08:00:24 Beam OperationMachine Operation Warning Beam Injection   07:35 Test run syn >> OK (ISYN =
14 mA)

08:00 Stop SOFB @ 76.7 mA
 2019-05-13-0800.PNG 
  6448   Sun 12 May 2019 08:16:29 Nitisart Kumdee Sun 12 May 2019 08:00:49 Beam OperationMachine Operation Note Beam Injection Completed 07:25 Test run syn >> OK (ISYN
= 15 mA)

08:00 Stop SOFB @ 73.98 mA
 SOFB_2019-05-12-0758.PNG 
  6447   Sat 11 May 2019 20:29:58 Chanwawit Somprasong Sat 11 May 2019 20:10:17 Beam OperationMachine Operation Note Beam Injection Completed 19:15 test run SYN = OK (Isyn=16 mA)

19:48 BL-8 request time 10 min 

20:10 stop SOFB @ 72.91 mA
 SOFB_2019-05-11-2004.PNG 
  6446   Sat 11 May 2019 08:23:19 Nitisart Kumdee Sat 11 May 2019 08:00:38 Beam OperationMachine Operation Note Beam Injection Completed 07:31 Test run syn >> OK (Isyn
= 14 mA)

08:03 Stop SOFB @ 73.33 mA
 SOFB_2019-05-11-0801.PNG 
  6445   Fri 10 May 2019 20:03:28 Nitisart Kumdee Fri 10 May 2019 20:00:49 Beam OperationMachine Operation Note Beam Injection Completed 19:25 Test run SYN >> OK (ISYN=
15mA).

20:00 Stop SOFB @ 91.88 mA.
 SOFB_2019-05-10-1958.PNG 
  6444   Fri 10 May 2019 14:38:36 Apiwat Pinyoyang Fri 10 May 2019 11:54:37 ProblemElectrical Warning Beam dumpCompleted5111:54 Beam
dump @ 115 mA / Electrical unstable (S-BM-M
fault, Y-BM-M fault, Y-QF-M fault,
  
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1