SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6462     Entry time: Sat 18 May 2019 08:22:36
Author: Apiwat Pinyoyang 
Event Time:Sat 18 May 2019 08:10:44 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

07:15 BL2.2 request 10 min.

07:40 Test run syn >> OK (Isyn = 10 mA)

08:10 Stop SOFB @ 74.8 mA

08:11 Warm up HBT, Set parameter for injection and open MPW gap

08:12 Beam drop during set parameter ( -8 mA )

08:15 Start injection (max rate = 7.9 mA/min; ave rate = 5 mA/min)

08:32 Stop injection @ 150 mA

08:35 Set parameter for beam store and close MPW gap completed.

08:38 SOFB completed @ 147.5 mA

Attachment 1: 2019-05-18-0805.PNG  254 kB  | Hide | Hide all
2019-05-18-0805.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1