RTime (min): 53 

19:45 BL8 request 10 min.

20:10 stop SOFB @ 98.9 mA

20:11 warm up HBT , set parameter for injection , open MPW gap 

20:12 S-STV-M10 cann't connectivity --> Change to spare

20:38 Re-initialize HBT and STR

20:44 start injection ( max rate = 8.5 mA/min)

21:32 stop injection @ 150 mA

21:36 set parameter for beam store , close MPW gap completed

21:38 SOFB completed @ 148 mA