Message ID: 6458     Entry time: Thu 16 May 2019 14:04:23
Author: Apiwat Pinyoyang 
Event Time:Thu 16 May 2019 12:16:26 
Type: Problem 
Section: Electrical 
Icon: Warning 
Subject: Beam dump 
Status: Completed 
RTime (min): 94 

12:16 Beam dump @ 145.44 mA / H-BH-M1, H-BH-M2, Y-QD-M, Y-QF-M, STR-RF fault / Reset >>> OK

12:21 Warm up HBT magnet, Set parameter for injection, Open MPW gap

12:37 Start injection(Max rate = 7 mA/min, AVG rate = 2 mA/min)

13:43 Stop injection @ 150 mA

13:48 Set parameter for store and close MPW gap complete

13:50 SOFB complete @ 148.3 mA