SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6457     Entry time: Thu 16 May 2019 13:53:36
Author: Apiwat Pinyoyang 
Event Time:Thu 16 May 2019 08:00:46 
Type: Beam Operation 
Section: Machine Operation 
Icon: Warning 
Subject: Beam Injection  
Status: Completed 
RTime (min): 215 

08:00 Stop SOFB @ 148.3 mA

08:01 Warm up HBT magnet, Set parameter for injection, Open MPW gap

08:06 Start injection (No beam)

09:56 Y-QD-M, H-BH-M1, H-BH-M2, S-BM-M, Y-QF-M, KFC-PS4 fault / Electrical unstable / Reset >>> OK

10:07 Re-warm up HBT, STR magnet

10:30 Start injection again / Can't inject to STR

11.25 Start injection (Adjust parameter STR and HBT = "2019-05-16 Full Energy Injection SMPW")

11:53 Stop injection @ 150 mA

11:57 Set parameter for store and close MPW gap complete

12:00 SOFB complete @ 148.4 mA

Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1