SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6456     Entry time: Wed 15 May 2019 20:29:09
Author: Somkiat Wisaiphion 
Event Time:Wed 15 May 2019 20:02:29 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status:  
RTime (min):  

 

20:02 stop SOFB @ 75.1 mA

20:05 warm up HBT , set parameter for injection , open MPW gap 

20:07 Beam drop during set parameter ( -11 mA )

20:09 start injection ( max rate =9.7 mA/min ; avg = 8 mA/min )

20:21 stop injection @ 150 mA

20:24 set parameter for beam store , close MPW gap completed

20:26 SOFB completed @ 149 mA

Attachment 1: 2019-05-15-2000.PNG  229 kB  | Hide | Hide all
2019-05-15-2000.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1