SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6454     Entry time: Wed 15 May 2019 08:32:40
Author: Somkiat Wisaiphion 
Event Time:Wed 15 May 2019 08:10:01 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status:  
RTime (min):  

07:40 Test run syn >> OK (Isyn = 12 mA)

07:45 BL1.1 request 10 min.

08:10 Stop SOFB @ 76 mA

08:11 Warm up HBT, Set parameter for injection and open MPW gap

08:12 Beam drop during set parameter ( -8 mA )

08:14 Start injection (max rate = 10 mA/min; ave rate = 7 mA/min)

08:26 Stop injection @ 150 mA

08:29 Set parameter for beam store and close MPW gap completed.

08:31 SOFB completed @ 149.2 mA

Attachment 1: 2019-05-15-0810.PNG  209 kB  | Hide | Hide all
2019-05-15-0810.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1