SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6453     Entry time: Tue 14 May 2019 21:24:18
Author: Somkiat Wisaiphion 
Event Time:Tue 14 May 2019 20:00:36 
Type: Beam Operation 
Section: Machine Operation 
Icon: Warning 
Subject: Beam Injection  
Status: Fixed 
RTime (min): 48 

19:40 test run SYN = OK (Isyn=10 mA)

20:00 stop SOFB @ 73.7 mA

20:01 warm up HBT , set parameter for injection , open MPW gap 

21:15 start injection ( max rate =11.8 mA/min ; avg = 10 mA/min )

         H-QD-M1 cannot monitor --> Replace to spare --> OK.

21:23 stop injection @ 150 mA

21:26 set parameter for beam store , close MPW gap completed

21:28 SOFB completed @ 149 mA

Attachment 1: 2019-05-14-2000.PNG  276 kB  | Hide | Hide all
2019-05-14-2000.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1