SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6452     Entry time: Tue 14 May 2019 08:18:38
Author: Somkiat Wisaiphion 
Event Time:Tue 14 May 2019 08:00:00 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status:  
RTime (min):  

07:36 Test run syn >> OK (Isyn = 10 mA)

08:00 Stop SOFB @ 74.9 mA

08:01 Warm up HBT, Set parameter for injection and open MPW gap

08:02 Beam drop during innitialize ( -5 mA )

08:05 Start injection (max rate = 7 mA/min; ave rate = 6 mA/min)

08:17 Stop injection @ 150.15 mA

08:20 Set parameter for beam store and close MPW gap completed.

08:22 SOFB completed @ 149.1 mA

Attachment 1: 2019-05-14-0800.PNG  179 kB  | Hide | Hide all
2019-05-14-0800.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1