SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6449     Entry time: Mon 13 May 2019 08:43:19
Author: Somkiat Wisaiphion 
Event Time:Mon 13 May 2019 08:00:24 
Type: Beam Operation 
Section: Machine Operation 
Icon: Warning 
Subject: Beam Injection  
Status:  
RTime (min):  

07:35 Test run syn >> OK (ISYN = 14 mA)

08:00 Stop SOFB @ 76.7 mA

08:01 Warm up HBT, Set parameter for injection and open MPW gap

08:01 Beam dump @ 76.7 mA due to S-BM-M fault , humen error , select warm-up STR

08:09 Re-warm up HBT,STR and set parameter for injection and open MPW gap

          MPS-SMPS coil quench after beam dump and reset turn-on ramp-up to 253 A

08:23 Start injection (max rate = 9.6 mA/min; ave rate = 7 mA/min)

08:40 Stop injection @ 150 mA

08:43 Set parameter for beam store and close MPW gap completed.

08:45 SOFB completed @ 149 mA

Attachment 1: 2019-05-13-0800.PNG  125 kB  | Hide | Hide all
2019-05-13-0800.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1