SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6448     Entry time: Sun 12 May 2019 08:16:29
Author: Nitisart Kumdee 
Event Time:Sun 12 May 2019 08:00:49 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

07:25 Test run syn >> OK (ISYN = 15 mA)

08:00 Stop SOFB @ 73.98 mA

08:01 Warm up HBT, Set parameter for injection and open MPW gap

08:05 Start injection (max rate = 10.41 mA/min; ave rate = 7 mA/min)

08:15 Stop injection @ 150.23 mA

08:18 Set parameter for beam store and close MPW gap completed.

08:20 SOFB completed @ 149.20 mA

Attachment 1: SOFB_2019-05-12-0758.PNG  191 kB  | Hide | Hide all
SOFB_2019-05-12-0758.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1