SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6400     Entry time: Fri 19 Apr 2019 08:57:35
Author: Apiwat Pinyoyang 
Event Time:Fri 19 Apr 2019 08:00:18 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

07:40 Test run syn >> OK  (Isyn = 10 mA)

08:00 Stop SOFB @ 59.2 mA

08:01 Warm up HBT, Set parameter for injection and open MPW gap

08:40 Start injection (Max rate = 9 mA/min)

08:51 Stop injection @ 110 mA

08:54 Set parameter for beam store and close MPW gap completed.

08:56 SOFB completed @ 109 mA

Attachment 1: SOFB_2019-04-19-0800.PNG  118 kB  | Hide | Hide all
SOFB_2019-04-19-0800.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1