SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6396     Entry time: Sun 07 Apr 2019 08:48:13
Author: Somkiat Wisaiphion 
Event Time:Sun 07 Apr 2019 08:00:30 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status:  
RTime (min):  

07:30 Test run syn >> OK  (Isyn = 5 mA)

08:00 Stop SOFB @ 66.5 mA

08:01 Warm up HBT, Set parameter for injection and open MPW gap

08:05 Start injection (Max rate = 9 mA/min)

08:42 Stop injection 

08:43 Beam drop 149 to 143 mA during set beam store

08:45 Set parameter for beam store and close MPW gap completed.

08:47 SOFB completed @ 143.2 mA

Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1