SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6395     Entry time: Sat 06 Apr 2019 19:58:56
Author: Apiwat Pinyoyang 
Event Time:Sat 06 Apr 2019 20:00:46 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

19:40 Test run SYN >> OK (Isyn= 10 mA)

20:00 Stop SOFB @ 66.8 mA

20:01 Warm up HBT, set parameter for injection and open MPW gap

20:05 Start injection  ( max rate 7 mA/min )

20:39 Stop injection @ 150.2 mA/min

20:41 Beam drop during set parameter for store from 150 to 135 mA

20:42 Set parameter for beam store, close MPW gap completed

20:44 SOFB completed @ 134.3  mA

Attachment 1: SOFB_2019-04-06-2000.PNG  151 kB  | Hide | Hide all
SOFB_2019-04-06-2000.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1