SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6393     Entry time: Fri 05 Apr 2019 20:56:17
Author: Apiwat Pinyoyang 
Event Time:Fri 05 Apr 2019 20:10:33 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

19:30 Test run SYN >> OK (Isyn= 10 mA)

19.53 BL-8 request time 10 min

20:10 Stop SOFB @ 67.6 mA

20:11 Warm up HBT, set parameter for injection and open MPW gap

20:15 Start injection

20:16 Beam dump @ 67 mA / Parameter diff / Load parameter >>> OK

20:17 Re-Start injection (Max rate = 8 mA/min)

20:50 Stop injection @ 150 mA/min

20:53 Set parameter for beam store, close MPW gap completed

20:55 SOFB completed @ 147.8  mA

Attachment 1: SOFB_2019-04-05-2010.PNG  175 kB  | Hide | Hide all
SOFB_2019-04-05-2010.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1