SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6392     Entry time: Fri 05 Apr 2019 08:29:19
Author: Somkiat Wisaiphion 
Event Time:Fri 05 Apr 2019 08:00:37 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status:  
RTime (min):  

07:35 Test run syn >> OK  (Isyn = 10 mA)

08:00 Stop SOFB @ 69 mA

08:01 Warm up HBT, Set parameter for injection and open MPW gap

08:05 RF-SYN fault to reset

08:08 Start injection (Max rate = 9 mA/min)

08:23 Stop injection @ 150.23 mA

08:25 Beam drop 149 to 143 mA during ramping

08:26 Set parameter for beam store and close MPW gap completed.

08:28 SOFB completed

Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1