Message ID: 6391     Entry time: Thu 04 Apr 2019 20:15:51
Author: Apiwat Pinyoyang 
Event Time:Thu 04 Apr 2019 20:05:25 
Type: Beam Operation 
Section: Machine Operation 
Icon: Idea 
Subject: Beam Injection  
Status: Completed 
RTime (min): 38 

19:40 Test run SYN >> OK (Isyn= 10 mA)

20:05 Dump beam @ 67.7 mA (K.Chachabhume request time for replace LL-STR-RF fan in storage ring)

20:06 Warm up HBT, set parameter for injection and open MPW gap

20:10 Start injection  ( No beam ) / Human error

20:24 Re-Warm up HBT,STR magnet

20:30 Start injection (Max rate = 12 mA/min)

21:22 Stop injection @ 150.1 mA/min

21:26 Set parameter for beam store, close MPW gap completed

21:28 SOFB completed @ 145.1  mA