SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6388     Entry time: Wed 03 Apr 2019 08:01:09
Author: Apiwat Pinyoyang 
Event Time:Wed 03 Apr 2019 08:00:02 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

07:40 Test run syn >> OK  (Isyn = 15 mA)

08:00 Stop SOFB @ 64 mA

08:01 Warm up HBT, Set parameter for injection and open MPW gap

08:05 Start injection (Max rate = 21 mA/min)

08:10 Stop injection @ 150.23 mA

08:13 Set parameter for beam store and close MPW gap completed.

08:15 SOFB completed @ 144.7 mA

Attachment 1: SOFB_2019-04-03-0800.PNG  164 kB  | Hide | Hide all
SOFB_2019-04-03-0800.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1