SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6387     Entry time: Tue 02 Apr 2019 20:06:43
Author: Apiwat Pinyoyang 
Event Time:Tue 02 Apr 2019 20:00:03 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

19:40 Test run SYN >> OK (Isyn= 15 mA)

20:00 Stop SOFB @ 66 mA

20:01 Warm up HBT, set parameter for injection and open MPW gap

20:05 Start injection  ( max rate 20 mA/min )

20:10 Stop injection @ 150.1 mA/min

20:13 Set parameter for beam store, close MPW gap completed

20:15 SOFB completed @ 148.37  mA

Attachment 1: SOFB_2019-04-02-2000.PNG  154 kB  | Hide | Hide all
SOFB_2019-04-02-2000.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1