SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6385     Entry time: Tue 02 Apr 2019 07:59:56
Author: Apiwat Pinyoyang 
Event Time:Tue 02 Apr 2019 08:10:12 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

07:00 Test run syn >> OK  (Isyn = 15 mA)

07:55 BL-1.1 request time 10 min

08:10 Stop SOFB @ 88 mA

08:11 Warm up HBT, Set parameter for injection and open MPW gap

08:13 Start injection (Max rate = 20 mA/min)

08:16 Stop injection @ 150.8 mA

08:19 Set parameter for beam store and close MPW gap completed.

08:15 SOFB completed @ 149.3 mA

Attachment 1: SOFB_2019-04-02-0810.PNG  137 kB  | Hide | Hide all
SOFB_2019-04-02-0810.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1