Message ID: 6383     Entry time: Mon 01 Apr 2019 20:21:23
Author: Apiwat Pinyoyang 
Event Time:Mon 01 Apr 2019 20:05:54 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

19.15 BL-8 request time 5 min.

19:30 Test run SYN >> OK (Isyn= 15 mA)

20:05 stop SOFB @ 68 mA

20:06 Warm up HBT, set parameter for injection and open MPW gap

20:10 Start injection  ( max rate 20 mA/min )

20:15 Stop injection @ 150 mA/min

20:17 Beam drop during set parameter for store.

20:19 Set parameter for beam store, close MPW gap completed

20:20 SOFB completed