SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6382     Entry time: Mon 01 Apr 2019 08:16:37
Author: Somkiat Wisaiphion 
Event Time:Mon 01 Apr 2019 08:00:55 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status:  
RTime (min):  

07:40 Test run syn >> OK  (Isyn = 18 mA)

08:00 Stop SOFB @ 67.3 mA

08:01 Warm up HBT, Set parameter for injection and open MPW gap

08:05 Start injection (Max rate = 21 mA/min)

08:10 Stop injection @ 150.23 mA

08:13 Set parameter for beam store and close MPW gap completed.

08:15 SOFB completed @ 148.9 mA

Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1