SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6381     Entry time: Sun 31 Mar 2019 20:13:25
Author: Chanwawit Somprasong 
Event Time:Sun 31 Mar 2019 20:00:51 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

19:10 Test run SYN >> OK (Isyn= 14 mA)

20:00 stop SOFB @ 67.1 mA

20:01 Warm up HBT, set parameter for injection and open MPW gap

20:05 Start injection  ( max rate 19 mA/min )

20:09 Stop injection @150.7 mA/min

20:12 Set parameter for beam store, close MPW gap completed

20:14 SOFB completed @ 149.49 mA

Attachment 1: SOFB_2019-03-31-1955.PNG  127 kB  | Hide | Hide all
SOFB_2019-03-31-1955.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1