SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6380     Entry time: Sun 31 Mar 2019 08:03:02
Author: Nitisart Kumdee 
Event Time:Sun 31 Mar 2019 08:00:19 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

07:30 Test run syn >> OK  (Isyn = 18 mA)

08:00 Stop SOFB @ 67.73 mA

08:01 Warm up HBT, Set parameter for injection and open MPW gap

08:05 Start injection (Max rate = 21.82 mA/min)

08:10 Stop injection @ 150.23 mA

08:12 Beam drop from 149.92 mA to 139.22 mA during set parameter for beam store.

08:13 Set parameter for beam store and close MPW gap completed.

08:16 SOFB completed @ 138.36 mA

Attachment 1: SOFB_2019-03-31-0759.PNG  135 kB  | Hide | Hide all
SOFB_2019-03-31-0759.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1