SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6379     Entry time: Sat 30 Mar 2019 20:00:07
Author: Chanwawit Somprasong 
Event Time:Sat 30 Mar 2019 19:27:47 
Type: Problem 
Section: Vacuum 
Icon: Warning 
Subject: Beam dump 
Status: Completed 
RTime (min): 31 

19:27 Beam dump @ 70.65 mA due to vacuum interlock occut in STR.

19:35 Warm up HBT, set parameter for injection and open MPW gap

19:43 Start injection  ( max rate 21 mA/min )

19:53 Stop injection @151.2 mA/min

19:55 Set parameter for beam store, close MPW gap completed

19:58 SOFB completed @ 148.09 mA

Attachment 1: 30-03-2019_vacuum.PNG  231 kB  | Hide | Hide all