SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6378     Entry time: Sat 30 Mar 2019 08:17:18
Author: Nitisart Kumdee 
Event Time:Sat 30 Mar 2019 08:05:53 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

07:30 Test run syn >>> OK  (Isyn = 16 mA)

07:50 BL1.1 request time 5 min.

08:06 Stop SOFB @ 68.40 mA

08:07 Warm up HBT, Set parameter for injection and open MPW gap

08:11 Start injection (Max rate = 19 mA/min)

08:16 Stop injection @ 150.42 mA

08:19 Set parameter for beam store and close MPW gap completed.

08:21 SOFB completed 

Attachment 1: SOFB_2019-03-30-0805.PNG  210 kB  | Hide | Hide all
SOFB_2019-03-30-0805.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1