SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6376     Entry time: Fri 29 Mar 2019 08:17:05
Author: Nitisart Kumdee 
Event Time:Fri 29 Mar 2019 08:00:22 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

07:26 Test run syn >>> OK  (Isyn = 16 mA)

08:04 Stop SOFB @ 69.85 mA

08:05 Warm up HBT, Set parameter for injection and open MPW gap

08:10 Start injection (Max rate = 19.47 mA/min)

08:15 Stop injection @ 150.22 mA

08:18 Set parameter for beam store and close MPW gap completed.

08:20 SOFB completed 

Attachment 1: SOFB_2019-03-29-0803.PNG  133 kB  | Hide | Hide all
SOFB_2019-03-29-0803.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1