Message ID: 6375     Entry time: Thu 28 Mar 2019 20:36:10
Author: Nitisart Kumdee 
Event Time:Thu 28 Mar 2019 20:10:25 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

19:34 BL2.2 request time 10 min.

19:40 Test run SYN >> OK (Isyn= 18 mA)

20:10 Dump beam @ 65 mA by STR-RF

20:11 Warm up HBT, set parameter for injection and open MPW gap.
          Mr.Chaiyut go into STR to test PS.

20:15 Mr.Chaiyut get to control room.

20:20 Start injection  (max rate = 21.78 mA/min)

20:28 Stop injection @150.24 mA

20:31 Set parameter for beam store, close MPW gap completed

20:33 SOFB completed

Attachment 1: SOFB_2019-03-28-2008.PNG  136 kB  | Hide | Hide all