  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6374     Entry time: Thu 28 Mar 2019 08:23:48
Author: Chanwawit Somprasong 
Event Time:Thu 28 Mar 2019 08:05:10 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

07:26 Test run syn >>> OK  (Isyn = 18 mA)

07:55 BL-1.1 request time 5 min

08:05 Stop SOFB @ 66.30 mA

08:06 Warm up HBT, Set parameter for injection and open MPW gap

08:11 Start injection (Max rate = 20.6 mA/min)

08:17 Stop injection @ 150.2 mA

08:19 Set parameter for beam store and close MPW gap completed.

08:23 SOFB completed 

Attachment 1: SOFB_2019-03-28-0757.PNG  133 kB  | Hide | Hide all
SOFB_2019-03-28-0757.PNG