SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6345     Entry time: Sun 17 Mar 2019 20:13:22
Author: Nitisart Kumdee 
Event Time:Sun 17 Mar 2019 20:10:43 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

19:21 BL8 request time 10 min.

19:30 Test run SYN >> OK (Isyn= 15 mA)

20:10 Stop SOFB @ 68 mA

20:11 Warm up HBT, set parameter for injection and open MPW gap

20:15 Start injection  ( max rate 13.7 mA/min )

20:24 Stop injection @ 150.18 mA

20:25 Beam drop from 149.88 mA to 141.36 mA during set parameter for beam store.

20:27 Set parameter for beam store, close MPW gap completed

20:29 SOFB completed @ 140.71 mA

Attachment 1: SOFB_2019-03-17-2009.PNG  155 kB  | Hide | Hide all
SOFB_2019-03-17-2009.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1