Message ID: 6344     Entry time: Sun 17 Mar 2019 08:16:12
Author: Apiwat Pinyoyang 
Event Time:Sun 17 Mar 2019 08:10:05 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

00.10 BL-8 request time 10 min

07:40 Test run syn >>> OK  (Isyn = 12 mA)

08:10 Stop SOFB @ 70 mA

08:11 Warm up HBT, Set parameter for injection and open MPW gap

08:15 Start injection (Max rate = 15.5 mA/min)

08:21 Stop injection @ 150 mA

08:24 Set parameter for beam store and close MPW gap completed.

08:27 SOFB completed 

Attachment 1: SOFB_2019-03-17-0810.PNG  180 kB  | Hide | Hide all
SOFB_2019-03-17-0810.PNG