SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6342     Entry time: Sat 16 Mar 2019 20:23:37
Author: Chanwawit Somprasong 
Event Time:Sat 16 Mar 2019 20:10:21 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

16:39 BL 5.2 request time 10 min.

19:27 Test run SYN >> OK (Isyn= 14 mA)

20:10 Stop SOFB @ 81.97 mA

20:11 Warm up HBT, set parameter for injection and open MPW gap

20:16 Start injection  ( max rate 17 mA/min )

20:20 Stop injection @ 150 mA

20:23 Set parameter for beam store, close MPW gap completed

20:26 SOFB completed

Attachment 1: SOFB_2019-03-16-1957.PNG  154 kB  | Hide | Hide all
SOFB_2019-03-16-1957.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1