SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6341     Entry time: Fri 15 Mar 2019 20:30:22
Author: Chanwawit Somprasong 
Event Time:Fri 15 Mar 2019 20:10:43 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

19:01 BL 8  request time 10 min.

19:24 Test run SYN >> OK (Isyn= 14 mA)

20:10 Stop SOFB @ 69.28 mA

20:11 Warm up HBT, set parameter for injection and open MPW gap

20:16 Start injection  ( max rate 11 mA/min )

20:23 Stop injection @ 150 mA

20:25 Beam drop from 149 to 139 mA

20:26 Set parameter for beam store, close MPW gap completed

20:30 SOFB completed

Attachment 1: SOFB_2019-03-15-1958.PNG  153 kB  | Hide | Hide all
SOFB_2019-03-15-1958.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1