SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6338     Entry time: Thu 14 Mar 2019 08:26:59
Author: Chanwawit Somprasong 
Event Time:Thu 14 Mar 2019 08:10:05 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

07:11 BL-2 request time 10 min

07:27 Test run syn >>> OK  (Isyn = 12 mA)

08:10 Stop SOFB @ 68.26 mA

08:11 Warm up HBT, Set parameter for injection and open MPW gap

08:15 Start injection (Max rate = 15.5 mA/min)

08:21 Stop injection @ 150 mA

08:25 Set parameter for beam store and close MPW gap completed.

08:27 SOFB completed 

Attachment 1: SOFB_2019-03-14-0802.PNG  189 kB  | Hide | Hide all
SOFB_2019-03-14-0802.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1