Message ID: 6335     Entry time: Wed 13 Mar 2019 08:30:35
Author: Nitisart Kumdee 
Event Time:Wed 13 Mar 2019 08:00:41 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):

07:30 Test run syn >> OK  (Isyn = 12 mA)

08:00 Dump beam by STR-RF @ 68mA

08:03 Apichai go into STR to get connector of magnet PS. 

          Warm up HBT, Set parameter for injection and open MPW gap

08.20 Apichai get to control room.

08:26 Start injection (Max rate = 12 mA/min)

08:45 Stop injection @ 150.21 mA

08:48 Set parameter for beam store and close MPW gap completed.

08:50 SOFB completed 