SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6334     Entry time: Tue 12 Mar 2019 20:33:23
Author: Nitisart Kumdee 
Event Time:Tue 12 Mar 2019 20:00:42 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

18.09 BL1.2 request time 10 min.

19:43 Test run SYN >> OK (Isyn= 14 mA)

20:10 Stop SOFB @ 65 mA

20:11 Warm up HBT, set parameter for injection and open MPW gap

20:15 Start injection >> No beam

20.23 Load file for STR-Magnest PS1 "2019-02-25 Full Energy Injection" => Result OK (max rate = 14 mA/min)

20:30 Stop injection @ 150.22 mA

20.32 Beam drop from 149.88 mA to 140.72 mA during set parameter for beam store

20:33 Set parameter for beam store, close MPW gap completed

20:36 SOFB completed

Attachment 1: SOFB_2019-03-12-2009.PNG  156 kB  | Hide | Hide all
SOFB_2019-03-12-2009.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1