SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6331     Entry time: Mon 11 Mar 2019 08:20:12
Author: Chanwawit Somprasong 
Event Time:Mon 11 Mar 2019 08:00:58 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

07:30 Test run syn >>> OK  (Isyn = 14 mA)

08:00 Stop SOFB @ 62.85 mA

08:01 Warm up HBT, Set parameter for injection and open MPW gap

08:05 Start injection (Max rate = 14.8 mA/min)

08:13 Stop injection @ 150 mA

08:16 Set parameter for beam store and close MPW gap completed.

08:20 SOFB completed 

Attachment 1: SOFB_2019-03-11-0752.PNG  187 kB  | Hide | Hide all
SOFB_2019-03-11-0752.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1