SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6277     Entry time: Wed 13 Feb 2019 20:22:55
Author: Nitisart Kumdee 
Event Time:Wed 13 Feb 2019 20:00:12 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

18.46 BL8 request time 10 min

19.35 Test run SYN >>OK (Isyn = 16 mA)

20:12 Stop SOFB @ 66 mA.

20:13 Warm up HBT magnet, Set parameter for injection, Open MPW gap

20:17 Start injection (Max rate = 16 mA/min) 

20:25 Stop injection @ 150.22 mA

20:28 Set parameter for store and close MPW gap completed.

20:30 SOFB completed

Attachment 1: SOFB_2019-02-13-2008.PNG  223 kB  | Hide | Hide all
SOFB_2019-02-13-2008.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1