SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6273     Entry time: Tue 12 Feb 2019 07:35:09
Author: Nitisart Kumdee 
Event Time:Tue 12 Feb 2019 20:00:21 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

19.30 Test run SYN >>OK (Isyn = 18 mA)

20:04 Stop SOFB @ 93 mA.

20:05 Warm up HBT magnet, Set parameter for injection, Open MPW gap

20:10 Start injection (Max rate = 17 mA/min) 

20:14 Stop injection @ 150.77 mA

20:17 Set parameter for store and close MPW gap completed.

20:30 SOFB completed

Attachment 1: SOFB_2019-02-11-1957.PNG  202 kB  | Hide | Hide all
SOFB_2019-02-11-1957.PNG
Attachment 2: 2019-02-11-1957.PNG  149 kB  | Hide | Hide all
2019-02-11-1957.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1