Message ID: 6266     Entry time: Sat 09 Feb 2019 11:37:46
Author: Chanwawit Somprasong 
Event Time:Sat 09 Feb 2019 09:09:45 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status: Completed 
RTime (min):  

6:30 Dump beam @63.6 mA

6:40 power-off

7:10 electricity shutdown

8:00 electricity come back

8:05 power on all system

8:27 warm up SYN magnets

8:55 test run SYN>>ok (Isyn=10mA)

9:09 warm up STR magnets

10:28 start injection (max rate 12.04 mA/min)

10:42 stop injection @150 mA

10:46 set parameter for beam store , close MPW gap complete

10:50 beam drop 148 mA>>73 mA   , set new SOFB

11:13 reinjection ,set parameter for injection , open MPW gap

11:16 start injection (max rate 8.8 mA/min)

10:28 stop injection @150 mA

10:32 set parameter for beam store , close MPW gap complete

11:33 SOFB complete

 

 

Attachment 1: SOFB_2019-02-09-0630.PNG  116 kB  | Hide | Hide all
SOFB_2019-02-09-0630.PNG
Attachment 2: 2019-02-09-0630.PNG  149 kB  | Hide | Hide all
2019-02-09-0630.PNG
Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1