SLRI Machine Status Accelerator Operation Cryogenics
  Accelerator E-Logbook  Not logged in Accelerator E-Logbook
Message ID: 6261     Entry time: Thu 07 Feb 2019 08:22:10
Author: Somkiat Wisaiphion 
Event Time:Thu 07 Feb 2019 08:00:28 
Type: Beam Operation 
Section: Machine Operation 
Icon: Note 
Subject: Beam Injection  
Status:  
RTime (min):  

08.00 Stop SOFB 

08.01 Warm-up HBT, Set parameter for injection and open MPW gap.

08.06 Start injection (Max rate = 16 mA/min)

08.14 Stop injection @ 150 mA

08.17 Set parameter for beam store and close MPW gap completed.

08.20 SOFB completed @ 148.4 mA

Accelerator Technology Division | Synchrotron Light Research Institute (Public Organization) | Powered by ELOG V3.1.1